47th Avenue – Sacramento, CA
Summit provided both environmental contracting and consulting services as part of the 47th Avenue pedestrian and bicycle improvements project in Sacramento. Services included the preparation of a transportation and disposal plan outlining the requirements for the handling of contaminated material and sampling and analysis plan. Field work included soil sampling and testing over several contaminated locations that run along the side of the CA-99. The levels of ADL were the primary concern and as a result, summit transported and disposed of hundreds of approximately 1,000 tons of hazardous material at a class I landfill