fullerton

Summit provided environmental consulting services as part of the Orange County Transportation Authority Raymond Avenue Grade Separation project. Consulting services included reviewing existing environmental reports for the site, preparation of a Lead Compliance Plan, Health and Safety Plan, Soil Sampling and Analysis Plan, Excavation Transportation Plan, soil sample collection along approximately 4,800 feet of railroad track and city streets, soil analysis and characterization, and stockpile sampling. Statistical analysis and perceived options for hazardous material disposal and reuse were completed by Summit in addition to management of the transportation and disposal of non-hazardous and California Hazardous soil. As part of the soil remediation, Summit excavated, loaded, and disposed of more than 150,000 tons of heavy metals contaminated soil.