State Highway Route 210 – Los Angeles, CA
Summit provided both in charge environmental consulting and contracting services as part of Highway Construction Activities in District 7 Route 210 from Interstate 5. Summit’s scope of work included Metrolink right-of-way improvements by excavating, loading, transporting, and disposing of a total of 2,305 Tons of hazardous and contaminated material at a proper landfill.
Services included preparation of an excavation and transportation plan, lead compliance plan, sampling, and analysis plan, and transportation and disposal plan outlining the requirements for the handling of contaminated material. Field work also included air monitoring, sampling, and training for hazardous materials.